OUR ONSHORE ACHIEVEMENTS









... and developments in Trinidad, Venezuela, Argentina and Mexico.
Project execution of
cryogenic modules
cryogenic modules
Cryogenic Modules
DRL was responsible for the redesign and construction of the Refinery ISBL and OSBL
Various developments in Indonesia, China, and
Malaysia
Malaysia
DRL managed the rapid construction of 3 CPF facilities in W Texas
DRL managed the E & C of this $1500M project - PMT of the onshore gas plants, slugcatcher and offshore plafforms
DRL has executed 95 brownfield upgrade projects for DCP Midstream Cryogenic Gas Plants in TX.
DRL managed construction of NBLM gathering systems and booster stations in Reeves Co, TX - 35 systems.
DRL was responsible for CMT & Commissioning
Hess Tioga Gas Plant in ND
Refinery Redesign & Rebuild
The DRL Far East Team
3 CPF Facilities
1200 mmscfd Gas Plants
Cryogenic Gas Plant
Pipelines in the Permian

ONSHORE EXPERIENCE
Black Lake Pipeline
• New NGL Pumping Stations - $3MM
Laredo Gathering Station
• Flow Diversion Project - $10MM
Goliad Gas Plant
• New Truck Loading Rack - $25MM
Noble Midstream
• Collier & Coronado Central Plants - $120M
• Compressor Station & 32 Gathering Lines
Petromax - $100M
• 25KBD Oil Refinery – Detailed Design w/ Vepica
LaGloria Gas Plant
• Jalapeno Compressor Station Upgrade - $2MM
• Jalapeno Header Modification - $2MM
• Amine Cooling Tower Upgrade - $1MM
• DCS & ESD System Upgrade -$3.5MM
Giddings Gas Plant
• New Amine Contactor - $1MM
• Power Systems Upgrade - $3MM
Three Rivers Gas Plant & TA
• New Control Room - $4MM
• DCS & ESD System Upgrade - $4MMB
• Amine Contactor Replacement $5MB
• Condensate Stabilizer System - $11M
• New NGL Pumping Stations - $3MM
Laredo Gathering Station
• Flow Diversion Project - $10MM
Goliad Gas Plant
• New Truck Loading Rack - $25MM
Noble Midstream
• Collier & Coronado Central Plants - $120M
• Compressor Station & 32 Gathering Lines
Petromax - $100M
• 25KBD Oil Refinery – Detailed Design w/ Vepica
LaGloria Gas Plant
• Jalapeno Compressor Station Upgrade - $2MM
• Jalapeno Header Modification - $2MM
• Amine Cooling Tower Upgrade - $1MM
• DCS & ESD System Upgrade -$3.5MM
Giddings Gas Plant
• New Amine Contactor - $1MM
• Power Systems Upgrade - $3MM
Three Rivers Gas Plant & TA
• New Control Room - $4MM
• DCS & ESD System Upgrade - $4MMB
• Amine Contactor Replacement $5MB
• Condensate Stabilizer System - $11M
TOTAL Petrochemicals USA
• Cray Valley Resin Plant Upgrades – Beaumont, Tx
• K17 Compression, La Porte
Cardon Repsol - ENI
• EPC PMT 1 x 150 Mmscfd and 1 x 300 Mmscfd JT Gas Plants, associated 23,000 bbl Slugcatcher, Onshore Gathering Systems and Offshore platforms - $1500M
Hess Bakken Tioga Cryogenic Gas Plant 2
• EPC PM, CM, Commissioning Lead, Inspection leads for Phases 1 & 2 and Commissioning - $1100MM
Hess Hawkeye, Bakken Shale
• Owner Team - EPC PM, Lead Engrs, Package Lead for Gathering
Phillips Bayway Refinery
• P66 Construction FCC TA Management Bayway, Refinery, New Jersey, US
Energy Transfer
• PMT for Revolution 2 Cryo Plant PMT assist for LC LNG development
Jaguar Production
• PMT assist Jaguar gas field developments - Mexico
TXIT 50 KBD Oil Refinery $300M
• Refinery & Terminal Redesign and Construction
Hydroskimming Refinery - $1000M
• Detailed Design in progress
• Cray Valley Resin Plant Upgrades – Beaumont, Tx
• K17 Compression, La Porte
Cardon Repsol - ENI
• EPC PMT 1 x 150 Mmscfd and 1 x 300 Mmscfd JT Gas Plants, associated 23,000 bbl Slugcatcher, Onshore Gathering Systems and Offshore platforms - $1500M
Hess Bakken Tioga Cryogenic Gas Plant 2
• EPC PM, CM, Commissioning Lead, Inspection leads for Phases 1 & 2 and Commissioning - $1100MM
Hess Hawkeye, Bakken Shale
• Owner Team - EPC PM, Lead Engrs, Package Lead for Gathering
Phillips Bayway Refinery
• P66 Construction FCC TA Management Bayway, Refinery, New Jersey, US
Energy Transfer
• PMT for Revolution 2 Cryo Plant PMT assist for LC LNG development
Jaguar Production
• PMT assist Jaguar gas field developments - Mexico
TXIT 50 KBD Oil Refinery $300M
• Refinery & Terminal Redesign and Construction
Hydroskimming Refinery - $1000M
• Detailed Design in progress
Carthage Gas Plant, Tx
• New Gas Plant Inlet System and Piperack - $25MM
• Gas Plant ESD System Upgrade - $3MM
Raywood Gas Plant, Tx
• EPC 70 Mmscfd Cryo Gas Plant Expansion - $85MM
Seeligson Gathering Station
• South Dean Pump Station - $3MM
Gulf Plains Gas Plant & TA Tx
• New LPG Loading Rack - $2MM
• Dean Pump Upgrades - $4MM
• New Control Room & DCS Upgrade - $8M
Wilcox Gas Plant & TA Tx
• New Gas Plant Booster Pump - $3MM
• Flare Meter Upgrade - $1MM
• Amine Flash Tank - $2MM
Wildcat, Crosstex & Cimarex
• New NGL Interconnects - $3MM Ea.
Crossroads Gas Plant
• Thermal Oxidizer Installation - $1MM
Springhills Gas Plant
• Inlet Liquid Handling & ESD System Upgrade -$5MM
• New Gas Plant Inlet System and Piperack - $25MM
• Gas Plant ESD System Upgrade - $3MM
Raywood Gas Plant, Tx
• EPC 70 Mmscfd Cryo Gas Plant Expansion - $85MM
Seeligson Gathering Station
• South Dean Pump Station - $3MM
Gulf Plains Gas Plant & TA Tx
• New LPG Loading Rack - $2MM
• Dean Pump Upgrades - $4MM
• New Control Room & DCS Upgrade - $8M
Wilcox Gas Plant & TA Tx
• New Gas Plant Booster Pump - $3MM
• Flare Meter Upgrade - $1MM
• Amine Flash Tank - $2MM
Wildcat, Crosstex & Cimarex
• New NGL Interconnects - $3MM Ea.
Crossroads Gas Plant
• Thermal Oxidizer Installation - $1MM
Springhills Gas Plant
• Inlet Liquid Handling & ESD System Upgrade -$5MM
OFFSHORE EXPERIENCE
Husky Energy
• Madura FPSO Owner Engr & ITT Tender Prep
Talisman Kinabalu Platform Debottlenecking FE and Owner Engr
Hess North Malay Basin Platform VE & FE Concept Design Studies
Ophir RSC Peer Review and PM Support Services
ALNG LNG Hub Concept Design
SK Energy B15 Concept Select to Pre-Feed Design Package
CNOOC Liwan CPF Platform Cost Reduction Study
Enquest Tj Baram RSC Ph 1 PM Services
KBB Project Close Out Report
GOM Benchmarking Weight & Costs
• DW FPUs
• Madura FPSO Owner Engr & ITT Tender Prep
Talisman Kinabalu Platform Debottlenecking FE and Owner Engr
Hess North Malay Basin Platform VE & FE Concept Design Studies
Ophir RSC Peer Review and PM Support Services
ALNG LNG Hub Concept Design
SK Energy B15 Concept Select to Pre-Feed Design Package
CNOOC Liwan CPF Platform Cost Reduction Study
Enquest Tj Baram RSC Ph 1 PM Services
KBB Project Close Out Report
GOM Benchmarking Weight & Costs
• DW FPUs
Mubadala SK320 Value Engineering Study
Petronas Bokor Phase 3 EORC Value Engineering Study
Murphy Kikeh DTU Spar
• Options Studies for IOR Facility
Owner Engineer assist on Falklands TLP development
BC Petroleum ROC Oil
• FPSO PMT Conversion Team at KSL Yard
Talisman Kinabalu Redevelopment
• Concept Select studies
Talisman BK-D Platform VE Process & Facility Studies
Twinza PNG FE Studies Pasca NGL Recycling & FSO
Repsol WHPs at COMMSA, Tampico, MEXICO
Newfield Blk 310 Sour Gas Platform FE Studies
Petronas Bokor Phase 3 EORC Value Engineering Study
Murphy Kikeh DTU Spar
• Options Studies for IOR Facility
Owner Engineer assist on Falklands TLP development
BC Petroleum ROC Oil
• FPSO PMT Conversion Team at KSL Yard
Talisman Kinabalu Redevelopment
• Concept Select studies
Talisman BK-D Platform VE Process & Facility Studies
Twinza PNG FE Studies Pasca NGL Recycling & FSO
Repsol WHPs at COMMSA, Tampico, MEXICO
Newfield Blk 310 Sour Gas Platform FE Studies
Newfield East Piatu Platform VE Process & Facility Studies
MP225A Subsea Tie Back Host Modifications
Petronas Baronia Platform VE Studies
PM lead for Murphy Azurite FDPSO Decommissioning
North Rankin B Project Close Out Benchmarking
Idemitsu Blk 05 Value Engineering Study
EM of Petrofac FPSO Engineering for Aker in KL
Start-up Operator
• PSC Bid Functional Basis & Cost Estimate
INPEX ICHTHYS Project
• Cost & Schedule Impact Assessment
Noble Energy Leviathan DW FPSO & FPU Field Dev & PMT team
MP225A Subsea Tie Back Host Modifications
Petronas Baronia Platform VE Studies
PM lead for Murphy Azurite FDPSO Decommissioning
North Rankin B Project Close Out Benchmarking
Idemitsu Blk 05 Value Engineering Study
EM of Petrofac FPSO Engineering for Aker in KL
Start-up Operator
• PSC Bid Functional Basis & Cost Estimate
INPEX ICHTHYS Project
• Cost & Schedule Impact Assessment
Noble Energy Leviathan DW FPSO & FPU Field Dev & PMT team
DEEPWATER EXPERIENCE
Kikeh - Gumusut Subsea Tie Back Decommissioning Cost Estimate
FLNG Cost and Schedule Benchmarking
Exmouth Plateau System Selection Cost Estimates
Limbayong Cost Estimates for Option Selection
Noble Equatorial Guinea Basin
• Option Analysis
Noble Energy Leviathan DW FPSO & FPU Field Dev & PMT team
FLNG Cost and Schedule Benchmarking
Exmouth Plateau System Selection Cost Estimates
Limbayong Cost Estimates for Option Selection
Noble Equatorial Guinea Basin
• Option Analysis
Noble Energy Leviathan DW FPSO & FPU Field Dev & PMT team
Stones Gulf of Mexico FPSO Project Health Check
BHP Mad Dog 2 Gulf of Mexico Semi Submersible Project Health Check
BHP Modec Shenzi TLP Topside Lead Position
Browse FLNG Near Field Cost Estimate
Noble Tamar FLNG OE Program Risk Assessment
Gumusut and Malikai Decommissioning Cost Estimates
Brunei - Merpai / Meragi Sub Sea Tie Back Cost Estimate
KPOC KME Subsea Tie Back Project Health Check
KME Development Scenario Cost Estimates
BHP Mad Dog 2 Gulf of Mexico Semi Submersible Project Health Check
BHP Modec Shenzi TLP Topside Lead Position
Browse FLNG Near Field Cost Estimate
Noble Tamar FLNG OE Program Risk Assessment
Gumusut and Malikai Decommissioning Cost Estimates
Brunei - Merpai / Meragi Sub Sea Tie Back Cost Estimate
KPOC KME Subsea Tie Back Project Health Check
KME Development Scenario Cost Estimates
Woodside Lambert Subsea Tie Back Project Health Check
Malikai Final Investment Decision Cost Estimate
Majoram and Rosmari Tension Leg Platform Cost Estimates (Malaysia)
Inpex Abadi Full Field Development Cost Estimate System Selection
Brunei Laksa FPSO Cost Estimate
INPEX ICHTHYS Project
• Cost & Schedule Impact Assessment
Sea Lion Tension Leg Platform Project Health Check
Woodside Persephone Subsea Tie Back Project Health Check
Kekek Development Cost Estimate
Malikai Final Investment Decision Cost Estimate
Majoram and Rosmari Tension Leg Platform Cost Estimates (Malaysia)
Inpex Abadi Full Field Development Cost Estimate System Selection
Brunei Laksa FPSO Cost Estimate
INPEX ICHTHYS Project
• Cost & Schedule Impact Assessment
Sea Lion Tension Leg Platform Project Health Check
Woodside Persephone Subsea Tie Back Project Health Check
Kekek Development Cost Estimate